Ridgecast Works ● Forge ParkApplications desk: +44 (0)114 244 0180
Ridgecast Works/Production lines/Underground Transfer Plant
Line · Underground

Underground Transfer Plant

Low-headroom secondary plant for decline and shaft-fed ore.

Applicable products & materials

Products

A single −40 mm product to the skip or decline conveyor.

Materials

Development and stope ore, −300 mm from the underground jaw.

Process steps

01

Envelope

Mine issues the heading drawing; Ridgecast fits the cone and screen to it.

02

Transfer

Short belts to the skip pocket; no overland in the decline.

Delivery scope

Design — circuit designCustom build — custom fabricationInstall — erectionCommission — commissioning

Gallery

Send the heading drawing.

The envelope drawing is the first input. Ridgecast fits the cone and screen to it and returns a first view within three working days.